Project Introduction
Solution Delivered
AISIKAI implemented its iPMCC Intelligent Power Distribution System and SKT1 Series ATS at a national-level big data center in Gui’an New Area, Guizhou, ensuring 99.99% power availability for China’s “East Data West Computing” hub.
Project: Critical Power Infrastructure for Guizhou Big Data Center
Project Overview Location: Gui’an New Area, Guizhou (National Computing Hub Node) Application: Dual-Power System for HPC & Disaster Recovery Centers AISIKAI’s Scope:
| ![]() |
Key Technical Specifications:
Transfer Time: <15ms (Compliant with GB/T 14048.11)
Altitude Rating: 2,000m without derating
Environmental Protection: IP42 (Condensation & Dust Proof)
Efficiency Standard: GB 37480-2019 Tier-1
Challenges Overcome
High-Altitude Electrical Performance – Special insulation design for low-pressure environments
Peak-Valley Tariff Optimization – Intelligent load scheduling aligned with hydropower cycles
Data Security Compliance – Achieved MLPS Level 3 Certification
Customer Benefits 1. Computing Reliability Assurance
2. Energy Efficiency Gains
3. Smart O&M Upgrade
| ![]() |